-
- Surveying
- Utility Designation
- Civil Engineering
- Landscaping
- Maintenance of Traffic
- Permitting
-
- Borings
- Geotechnical engineering
- Pavement cores
- Right of Way Surveying
- Topographic Surveying
-
- 970 ft. long 13 Span bridge
- Deck replacement
- Replacement of all Bearings
- Elimination of Joints at Alternate Pier Locations
-
- 5 Miles Roadway and 5 Bridges
- New Ramps & C-D Roads
- River Mechanics
- One Curved Bridge, 2 Bridges Over Waterways and 2 Bridges with Grade Separation
- Overall Cost: $60 Million
-
- 5 Miles of Roadway, Sidewalks, Curb and Gutter Reconstruction
- Drainage Improvement and Utility Relocations
- Lighting and Traffic Signal, Streetscape with LID Concepts