• Surveying
    • Utility Designation
    • Civil Engineering
    • Landscaping
    • Maintenance of Traffic
    • Permitting

    • Borings
    • Geotechnical engineering
    • Pavement cores
    • Right of Way Surveying
    • Topographic Surveying

    • 970 ft. long 13 Span bridge
    • Deck replacement
    • Replacement of all Bearings
    • Elimination of Joints at Alternate Pier Locations

    • 5 Miles Roadway and 5 Bridges
    • New Ramps & C-D Roads
    • River Mechanics
    • One Curved Bridge, 2 Bridges Over Waterways and 2 Bridges with Grade Separation
    • Overall Cost: $60 Million

    • 5 Miles of Roadway, Sidewalks, Curb and Gutter Reconstruction
    • Drainage Improvement and Utility Relocations
    • Lighting and Traffic Signal, Streetscape with LID Concepts